Sunday, April 27, 2008
Etna, N.H.
Zero clearance finished with granite
Zero clearance fireplace, custom woodwork, finished with limestone tiles
Sunday, March 16, 2008
Saturday, March 8, 2008
Cottage Club Rd, Stowe, VT.
Bedroom remodel. We replaced the cedar that had been painted with sheetrock.
Same room with the walls removed. Notice the framing has very random spacing. Also we removed the large ( 6' x 10') window and replaced it with an Anderson.
Here is the room with 6" and 8" randomly spaced pine. It was finished with stain and a fresh coat of poly.
Fresh coat of poly. New Anderson windows stained to match the floor. The beam you see is cased with primed pine. It is hiding an ugly structural beam with exposed bolts.
More pics to come.
Some pics with furniture.
Etna, NH.
Stowe, VT
Wednesday, March 5, 2008
Etna, NH
Jericho, VT.
Jericho, VT.
This dormer was installed to provide room for a new bathroom. You could not stand up in the old one. The new bathroom has ten foot ceilings!
18 ft. gable dormer in progress
18 ft. gable dormer to house new bathroom, before the windows were installed
Cherry vanities, Toilet is hidden in the small room, notice the ten foot ceilings
6" carmalized bamboo, cherry vanities with drop in sink and brushed nickle Moen hardware
Cherry vanities, Anderson windows and Manor Hall paint
18 ft. gable dormer in progress
18 ft. gable dormer to house new bathroom, before the windows were installed
Cherry vanities, Toilet is hidden in the small room, notice the ten foot ceilings
6" carmalized bamboo, cherry vanities with drop in sink and brushed nickle Moen hardware
Cherry vanities, Anderson windows and Manor Hall paint
Subscribe to:
Posts (Atom)